Cheyenne Data Center Support Structures

All-Weather Workforce & Mission-Critical Infrastructure in Wyoming’s Harsh Climate

Cheyenne, Wyoming isn’t known for mild conditions.

​

High winds. Sudden storms. Heavy snow loads. Rapid temperature swings.

​

On an active data center construction site, those elements aren’t just uncomfortable — they can threaten schedule, material integrity, and workforce productivity.

​

The CHY project required temporary infrastructure that could perform under pressure — not just provide coverage.

When the Weather Isn’t Just an Inconvenience — It’s a Risk

The Operational Requirement

Site Required: 

Workforce craft commons and daily stand downs

Site Required: 

Weather-protected break and coordination areas

Site Required: 

Secure storage for sensitive data center components

Site Required: 

Staging environments for mission-critical system preparation

But in Wyoming’s environment, standard temporary shelters weren’t enough.

​

The structures needed to withstand:

  • Significant wind loads

  • Snow accumulation

  • Rapid weather shifts

  • Continuous jobsite activity

​

Without properly engineered buildings:

  • Materials risked exposure and damage

  • Crew productivity could drop during severe conditions

  • Staging workflows would be disrupted

  • Schedule pressure would intensify

​

This wasn’t just about convenience.

​

It was about resilience.

Why It Mattered

Data center construction operates on strict commissioning timelines. In regions like Cheyenne, weather can quickly become the deciding factor between staying ahead — or falling behind.

​

Crews needed reliable protection.
Mission-critical components required dry, secure storage.
Installation teams needed stable staging space regardless of outside conditions.

​

If the support infrastructure failed, the schedule would feel it immediately.

The GNB Buildings Solution

GNB Buildings engineered and installed three 72’ x 140’ tension fabric structures, designed specifically to meet Wyoming’s demanding environmental conditions.​

  • ​Total Structures Installed: 3

  • Size: 72’ x 140’ tension fabric buildings

  • Primary Use: Craft commons + secure storage + staging

  • Environment: High-wind, snow-load region

  • Outcome: Weather-resilient workforce and material protection

Project Snapshot